AQUA FREED® & AQUA GARD™ Case Studies
Successful Rehabilitation of Over 6,000 Water Wells Worldwide
The AQUA FREED® well rehabilitation process has been extremely successful in restoring lost capacity to more than 6,000 wells worldwide, during the past 22 years. Below is a small sampling of before and after results from the AQUA FREED® well rehabilitation process.
Case Study 1
| Client: | New York State Office of General Services (OGS) |
| Site: | Bedford Hills CF, Bedford Hills, New York |
| Well ID: | Well #9 |
| Well Depth: | 70 ft bg |
| Well Diameter: | 12 inch |
| Well Construction: | Gravel packed |
| Screen Interval: | 40 - 69 ft bg. |
| Aquifer: | Sand and gravel |
| Original Specific Capacity: | 4.6 gpm/ft @ 110 gpm |
Well #9 was installed in 1964 but was never used due to a low yield (110 gpm). In April of 1997 Well 9 was redeveloped using the AQUA FREED® process followed by surge block agitation. Prior to redevelopment well #9 was televised and pump tested. The video inspection revealed a significant amount of encrustation on the well screen. The interval between 40 ft bg. and 54 ft bg. was extensively clogged with only the vertical supports visible. From 54 ft bg. to 69 ft bg. the screen was less clogged. The results of the pre and post-redevelopment efforts are summarized below:
|
Pre-Redevelopment
|
|||
|
Discharge Rate (gpm)
|
Pumping Level (Ft bg.)
|
Drawdown (ft.)
|
Specific Capacity (gpm/ft)
|
|
75
|
30.88
|
26.35
|
2.9
|
|
Post-Redevelopment
|
|||
|
Discharge Rate (gpm)
|
Pumping Level (Ft bg.)
|
Drawdown (ft.)
|
Specific Capacity (gpm/ft)
|
|
75
|
10.94
|
6.21
|
12.1
|
|
160
|
21.49
|
16.76
|
9.5
|
|
225
|
26.03
|
21.30
|
10.6
|
|
260
|
33.77
|
29.04
|
9.0
|
Well #9 was pumped at a rate of 260 gpm for a 24-hour period. The specific capacity values at the completion of the test were two times greater than the original specific capacity and three times greater than .the pre-redevelopment specific capacity. The long term recommended pumping rate of well 9 is 225 gpm.
Case Study 2
| Client: | New York State Office of General Services (OGS) |
| Site: | Bedford Hills Correctional Facility Stormville, New York |
| Well ID: | Well #3 |
| Well Depth: | 77 ft bg |
| Well Diameter: | 10 inch |
| Well Construction: | Gravel packed |
| Aquifer: | Sand and gravel |
In April of 2008 well #3 was redeveloped using the AQUA FREED® process followed by mechanical development (surging and pumping). Pre-development video inspection and step rate pumping test were performed to verify well integrity and to determine the pretreatment yield and efficiency, with the results of the pumping data reflected below. The AQUA FREED® process was performed, followed by 2 days of mechanical development. Post re-development pumping data as seen below, increased the pumping rate from 150 GPM with a specific capacity of 3.23 to a pumping rate of 350 GPM at a specific capacity of 7.37, more than doubling both yield and efficiency. NOTE: Well #3 had been previously rehabilitated in January of 2003, with good results. After the treatment in 2008, the well was equipped with AQUA GARD™, now allowing for scheduled, cost efficient preventative maintenance, thereby maintaining increased production and efficiency at reduced cost.
The post treatment video survey revealed a considerable improvement in the condition of the screen with the results of the pre and post redevelopment data shown below.
|
Pre-Redevelopment
|
|||
|
Discharge Rate (gpm)
|
Pumping Level (Ft bg.)
|
Drawdown (ft.)
|
Specific Capacity (gpm/ft)
|
|
150
|
55.8
|
46.5
|
3.23
|
|
Post-Redevelopment
|
|||
|
Discharge Rate (gpm)
|
Pumping Level (Ft bg.)
|
Drawdown (ft.)
|
Specific Capacity (gpm/ft)
|
|
153
|
19.15
|
15.15
|
10.09
|
|
250
|
31.7
|
27.7
|
9.02
|
|
350
|
51.45
|
47.45
|
7.37
|
Case Study 3
| Client: | Village of Greenwood Lake |
| Location: | Greenwood Lake, NY |
| Well ID: | Well E |
| Well Depth: | 96 ft. |
| Well Diameter: | 8" |
| Well Construction: | Screened |
| Aquifer: | Sand and gravel |
Well E historically suffered from lost capacity and poor water quality problems as a result of severe manganese plugging. Well E had been cleaned in the past using conventional chemical and acid methods in an attempt to recover the lost capacity and improve the water quality, with marginal success. A video inspection revealed significant buildup on the well screen and in 2005, Subsurface Technologies was contracted to use the AQUA FREED® process as the solution to this chronic plugging problem. The well was brushed, followed by an Aqua Freed injection and then mechanically developed for 1 day. A post video inspection revealed a completely clean screen and a post treatment step rate pumping test performed. Results of the pre and post pumping test are shown below. In addition to the increased yield and efficiency, water quality was greatly improved due to complete deposit removal. This well was then equipped with AQUA GARD™ to prevent future lost capacity and maintain water quality.
|
Pre-Redevelopment
|
|||
|
Discharge Rate (gpm)
|
Pumping Level (Ft bg.)
|
Drawdown (ft.)
|
Specific Capacity (gpm/ft)
|
|
145
|
33.4
|
21.3
|
6.81
|
|
200
|
46.25
|
34.15
|
5.86
|
|
254
|
60.8
|
48.7
|
5.22
|
|
Post-Redevelopment
|
|||
|
Discharge Rate (gpm)
|
Pumping Level (Ft bg.)
|
Drawdown (ft.)
|
Specific Capacity (gpm/ft)
|
|
145
|
12.67
|
8.82
|
16.44
|
|
200
|
27.44
|
14.59
|
13.71
|
|
250
|
33.7
|
20.85
|
11.99
|
|
350
|
55.2
|
42.35
|
8.26
|
Case Study 4
| Client: | Aqua Ohio, Inc. |
| Site: | Massillon, Ohio |
| Well ID: | STARK WELL #5 |
| Well Depth: | 130 ft bg |
| Well Diameter: | 26" x 36" |
| Well Construction: | Gravel packed |
| Screen Length: | 58 ft |
| Static Water Level: | 33 ft bg |
| Aquifer: | Sand and gravel |
Stark #5 was installed in 1967, and performed well for about 10 years. Eventually the well required cleaning every 2 years using traditional chemical and acid methods, however results continued to decline. By the summer of 2006 the client was advised by a local drilling contractor to abandon the well and install a replacement well. The client however decided to rehabilitate the well using Aqua Freed and in October 2006 a pre-treatment step rate pumping test was performed resulting in a maximum yield of 1833 GPM with a Specific Capacity of 71.6 GPM/ft. After a 2 week AQUA FREED® redevelopment effort the well produced 2353 GPM with a Specific Capacity of 150.2 for an increase of +/-110%. The well was immediately equipped with an AQUA GARD™ preventative maintenance system to prevent lost yield and efficiency going forward.
Case Study 5
| Client: | Village of Montgomery |
| Location: | Montgomery, NY |
| Well ID: | Holt Well #3 |
| Well Depth: | 50 ft |
| Well Diameter: | 12" |
| Well Construction: | Screened |
| Screen Length: | 10 ft |
In 2000 the Village of Montgomery installed well #4 to serve as the primary water supply for the village, because well #3 was unable to produce an adequate sustainable yield. In 2004, well #4 began to decline, however could not be taken out of service until a replacement well was put into production. A video inspection was performed on well #3 revealing little screen plugging, however at the advice of Subsurface Technologies the town commenced with using AQUA FREED® to clean #3 in spite of the results of the video. As you can see in the table of results below, well #3 responded very well to treatment signifying that although the plugging on the screen was minimal, the well experienced considerable formation and gravel pack plugging behind the screened interval. Well #3 was then included in the system and well #4 cleaned with AQUA FREED® with excellent success. Both wells were immediately equipped with AQUA GARD™ preventative maintenance devices and scheduled for service on a 6 month cycle to insure that production and efficiency were maintained and have been performing well since that time.
|
Pre-Rehabilitation
|
|||
|
Discharge Rate (gpm)
|
Drawdown (ft.)
|
Pumping Level (Ft bg.)
|
Specific Capacity (gpm/ft)
|
|
100
|
10.8
|
22.8
|
9.25
|
|
150
|
16.55
|
28.55
|
9.06
|
|
Post-Rehabilitation
|
|||
|
Discharge Rate (gpm)
|
Drawdown (ft.)
|
Pumping Level (Ft bg.)
|
Specific Capacity (gpm/ft)
|
|
102
|
4.25 |
17.4
|
24
|
|
150
|
6.25 |
19.65
|
23
|
|
200
|
9.5 |
22.65
|
21
|
|
260
|
14.7 |
27.92
|
17.7
|
Investor Owned Water Utility – Aqua America, PA – AQUA FREED® & AQUA GARD™
In November of 2004, AQUA GARD™ was installed on 1 of a 5 well potable water supply system.The well was completed to 540’ and produced 160 GPM with a pumping level of 259’. Almost immediately well yield and efficiency began a steady decline. Within 6 months the well had lost 35% of its yield and 37% of its efficiency. The well was cleaned and AQUA GARD™ installed. Based on the historical performance the well would have required cleaning at 6 month intervals to minimize lost yield and reduced efficiency. The following represents the actual cost benefit analysis for installation of an AQUA GARD™ preventative maintenance system at this site.
|
Forest PA 5 Well Site
|
Without AQUA GARD™
|
With AQUA GARD™
|
SAVINGS
|
| Well Rehabilitation |
$19,000
|
$19,000
|
|
| Aqua Gard™ Installation |
|
$7,000
|
|
| Service Events During 3 Year Cycle |
5
|
11
|
|
| Cost Per Service |
$19,000
|
$3,400
|
|
| Energy Cost |
$$
|
$
|
|
| Supplemental Water Cost |
$$
|
0
|
|
| Total Per Well Cost for 36 Months |
$114,000
|
$63,400
|
$50,600
|
| Cost Per Site During 36 Month Term | $570,000 |
$317,000
|
$253,000
|
Industrial Site – AQUA GARD™
A 9 well industrial site in the northeast required rehabilitation every 6 months to restore lost capacity caused by very high levels of biological activity and producing extremely poor water quality, rendering the wells un-potable. In 2001 AQUA GARD™ was installed in 5 of the 9 wells, followed by quarterly AQUA GARD™ preventative scheduled maintenance. The result: increased yield, sustained higher pumping levels & efficiencies, and significantly reduced cost. Plant demand was then fully met by the 5 wells equipped with AQUA GARD™, reducing maintenance and energy costs during the following 3 year period as shown in the cost benefit analysis below. Water quality was also greatly improved thereby lowering treatment costs.
|
36 Months Without AQUA GARD™
|
36 Months With AQUA GARD™
|
SAVINGS
|
|
| Item |
10/98 to 10/01
|
10/01 to 10/04
|
|
| Well Rehabilitation |
$9,200
|
$9,200
|
|
| Aqua Gard™ Installation |
|
$2,595
|
|
| Cleaning Cost Per Event |
$9,200
|
$2,520
|
|
| Number of Events During Cycle |
5
|
11
|
|
| Cleaning Cost During Cycle |
$46,000
|
$27,720
|
|
| Number of Wells Serviced |
9
|
5
|
|
| Energy Cost |
$$
|
$
|
|
| Supplemental Water Cost |
$$
|
0
|
|
| 3-year Total per Well |
$55,200
|
$39,515
|
$15,685
|
| 3-year Total for System | $496,800 |
$197,575
|
$299,225
|
Poweshiek Water Association – Tama, Iowa- AQUA FREED® & AQUA GARD™
Poweshiek Water Association is a public water utility that provides potable water to 10 counties in Iowa. The Tama well Field has 11 groundwater wells required to meet its 2.2 million gallon per day demand for its customers. Although the utility was performing "shock chlorination" to its wells the production rate was declining. In the spring of 2004 STI was contracted to clean one well using AQUA FREED® for evaluation purposes. It was Poweshiek’s intention to evaluate the performance of the treatment during the next 12 months and determine if continued use was warranted. Within 6 months, the utility was extremely pleased with the performance of the treatment and engaged STI to rehabilitate 2 additional wells and equip the 3 wells treated to date with AQUA GARD™ preventative maintenance system. By the spring of 2006 Poweshiek had fully recognized the benefits of using AQUA FREED® well rehabilitation technology and AQUA GARD™ preventative maintenance systems, and accelerated its rehab and maintenance program to clean and equip all of its 11 groundwater wells to maintain the needed well yields. Today, service is performed annually to each well for a fraction of the cost of well rehabilitation, while maintaining consistent system production.
United Water of New York
A 12" diameter gravel pack well was constructed in 1975 and when new had a specific capacity of 13.6. Iron bacteria fouling was so severe that the client resorted to hypochloride treatments every 30 days with minimal results. Historically the well had been redeveloped using every traditional technique (chemical,acid, mechanical development, etc.). Immediately prior to using the AQUA FREED® treatment the wells specific capacity had declined to 10.2. After a 2 day treatment the wells specific capacity had increased to 17.19 and maintained safe pumping levels for 3 years at which time the well was redeveloped by AQUA FREED® returning it to excess its original production levels.
Stillwater
The Village of Stillwater NY was performing well rehabilitation to its 5 groundwater wells using its own equipment and staffing for chemical and acid treatments. Results were marginal and short lived, not due to staff or equipment, but rather because this cleaning method was not effective at completely removing deposits from the formation. STI was contracted to treat one well with AQUA FREED® and equip the well with an AQUA GARD™ preventative maintenance device. Shortly thereafter due to excellent results from the AQUA FREED® treatment and AQUA GARD™ service, the Village engaged STI to clean and equip all of its wells. Today the Village is enjoying all the water to meet their needs at a greatly reduced cost and with no interruption.
Super Fund Site in Northeastern U.S.
This product recovery well was part of a 13 well ground water remediation system at a Super Fund site operated by a large industrial customer. The wells were installed in 1994 losing capacity rather quickly. Traditional acid/chemical treatments were performed on all 13 wells with little to no improvement. Subsurface Technologies, Inc. was contracted to treat one well early in 1996 increasing the specific capacity from .10 to 1.57 thereby allowing the more rapid extraction of the contaminated water. Since the clients original use of AQUA FREED® to rehabilitate this well, all wells are cleaned using Aqua Freed every 3 years to meet capture requirements.
City of Sioux Falls, South Dakota - Collector Well
Well construction consisted of a 13 ft. inner diameter concrete caisson inserted to a depth of 39 ft. 4 @ 12" diameter slotted lateral pipes extended from various points at the caisson into the gravel aquifer to distances of approximately 150 ft. When originally constructed in 1983 the wells specific capacity was 69gpm/ft. of draw down. Early in 1992 and due to severe biofouling and mineral encrustation, the wells specific capacity had declined to 46.6gpm/ft of draw down. Several redevelopment efforts resulted in limited success. After a 7 day AQUA FREED® treatment the well's specific capacity had increased to 72.5gpm/ft. of draw down.
Augusta County Service Authority in Staunten, VA
In 1999 STI was contracted to clean and redevelop a well that had been plagued with Iron Related Bacteria, resulting in poor water quality and loss of capacity. AQUA FREED® completely restored the wells yield and efficiency. In 2006, STI was again engaged to clean the well, however, this time the client requested the well be equipped with AQUA GARD™ after the AQUA FREED® treatment was complete, in an effort to maintain the wells yield and efficiency at lower cost.